The large gantry crane of Jiangxi Crane Machinery Factory was successfully developed.

Recently, two super-large gantry cranes with a lifting capacity of 470 tons were successfully developed at the Jiangxi Crane Machinery Plant and invested in the construction of a high-speed railway project from Wuhan to Guangzhou.
It is reported that the two gantry cranes can simultaneously lift the box girder with a weight of 900 tons. Its development has successfully filled a gap in the use of ultra-large lifting equipment in the construction of high-speed railways in China.

Mazda Body Kit

Sandboard Fender Leaf Board,Mazda Automobile Refitting,Sandboard Fender Carbon Fibre,Leaf Board Resin Fibre

Hunan Province Yuhang Auto Parts Co., Ltd , https://www.yuhangparts.com

Posted on