Progress Stage: Environmental Impact Assessment Construction Period: 2011-2012
Major equipment: firefighting facilities, security facilities, water supply and drainage facilities, electrical facilities, building facilities, etc. Project Description: The project is located in the southern living area (third living quarters) on campus, and the east side is adjacent to the Aerodynamic Research Institute of Harbin, and the south side. Near the reconstructed Majiagou River, there are 50 meters wide green belts and attractions on both sides of the river, and the west side is connected with Huashan Road. The project dismantled the original eight multi-storey residential buildings in the third living quarters, a total of 588 sets. A total of 1,500 new high-rise buildings have been built. The project has a total construction area of ​​184,457 square meters, including 144,150 square meters of high-rise residential buildings, 3,860 square meters of public buildings, 31,077 square meters of underground parking, and 5,370 square meters of underground civil air defense works.
The total investment of the project is 730 million yuan, of which the engineering cost is 470 million yuan, the other costs are 208 million yuan, the basic reserve fund is 41.07 million yuan and the sales cost is 4.61 million yuan.
Construction Unit: Harbin Engineering University Science and Technology Park Construction and Development Co., Ltd. Postal address: 258, Nantong Street, Nangang District, Harbin, Heilongjiang Province, China Post code: 150011
Contact: Guo Sixiu Tel - 82519054
Design Unit: Harbin Normal University Postal address: No. 1, South University Road, Limin Economic Development Zone, Harbin City, China Post code: 150025
Contact: Chen Yu Tel
Vehicle Mounted Hedge Trimmer,Vehicle-Mounted Large Multi-Function Hedge Trimmer,Trimmer For Plants On City Roads Twice,Automatic Vehicle Mounted Hedge Trimmer
Henan Lukewei Road Machinery Manufacturing Co.,Ltd , https://www.lukeweimachinery.com