China Drying Network News Huanggang Chemical Industrial Park Zhoudingwan Village Resettlement Community Construction Phase II project was officially started. Up to now, the Chemical Industry Park has successively built 5 newly-built and rebuilt districts, and concentrated the construction of houses to provide demolition farmers with preferential prices of only 400 yuan per square meter. The per-person housing area of ​​the relocated households has reached more than 40 square meters, effectively guaranteeing that the park spans Harmonious Development.
The project was contracted by Hubei Zhonghao Group, a top 20 qualification in the Hubei construction industry, with a national qualification, with a total construction area of ​​90,000 square meters, a total investment of 120 million yuan, a main building of 13 buildings of 6+1 type, and a 17-floor elevator house. 4 Dong, is expected to be completed by the end of next year.
The construction project is also an important part of the infrastructure construction project of the Chemical Park, and it is also an important public-minded project of the Park Management Committee to improve the living conditions of the relocated households and promote the special expansion of land intensive use.
The Chemical Park Management Committee strictly follows the requirements and plans for the demolition and resettlement work of the municipal government and the municipal government. It plans ahead and takes positive actions to speed up the construction of the resettlement area.
Vertical Cement Silo
Product Advantages
1.Waterproof, moistureproof, prevent the loss of cement, reduce urban air pollution, small footprint, long service life and low cost. It is the environmentally friendly construction machinery promoted widely in China.
2.We have a lot of stock of bulk cement silo in general Capacity :100t,150t,200t,300t. It can be produced in different size according to user`s requirements.
3. The cement silo is generally cylindrical structure. There are a dust removal equipment on it to prevent dust leakage and a brake device under it to prevent dust caking, so the powder can be discharged smoothly.
Cement silo working principle:
1.Bulk cement truck transports the cement to the site.
2. Conveying the cement in truck to cement silo by the air pressure of the truck.
3. Conveying the cement in cement silo to the Concrete Mixer by the Screw Conveyor.
Installation; Debugging; Training; Maintenance.
A.When training your operators, our engineer will give them advice on how to operate the machines correctly and provide the construction program.
B.We will send you the operation manual which can help you operate the machines properly and solve some common problems.
C.Call us at any time if you have problem with our concrete plant.
D.If necessary, we will send engineers to your site to solve your problem.
E.Spare parts supply
Vertical Cement Silo,Cement Concrete Silos,Cement Silo Trailers,Cement Horizontal Silos
Zhengzhou XinFeng machinery manufacturing Co. Ltd , https://www.xfmachinery.com