Explaining the installation of traffic safety slide wires

Many customers have to consider the installation plan because of the workshop transformation. For the steel structure workshops, many old workshops need to be reconstructed. It is necessary to consider the installation scheme of the trolley sliding lines. Regardless of the special situation, the trolley wire is overhead, instead of trench. With respect to the installation of overhead trolley lines, safety is a primary consideration.

First, traffic safety trolley line installation 1, the entire workshop renovation, demolition of old equipment, before the demolition of old equipment, must ensure that the power of each way is cut off, so as not to endanger the power supply, dismantle the safety of personnel, the general dismantling process, first Remove the old slide wire according to the reverse order of the previous installation. Take the slide line first, and then lift the rack, the bracket, the joint jacket, the power input, etc. After that, remove the angle bracket under the rail pressure plate. The removal is basically completed.

2, safety slide installation:

a. According to the situation of the trolley line, this article takes the DHH-200A-L trolley line as an example. After the trolley line has been purchased, it is installed according to the manufacturer's instructions. The angle bracket is welded or fixed to the rail under the 1.25-meter distance.

b. After fixing the angle bracket, install the lifting rack and fixing bracket under the angle bracket.

c. Afterwards, fix the trolley wire under the lifting rack and the fixing frame, and install the power input, the aluminum connector of each sliding wire connection point, and then install the joint jacket and end cap.

d. When the current collector is installed, the current collector bracket is welded to the standard position of the vehicle, and the current collector penetrates into the current collector bracket, and the parallel distance between the current collector and the trolley line is adjusted.

3, slip line debugging. After the equipments are installed, prepare the slide wire for debugging. Use special equipment to keep the angle brackets parallel and the sliding lines do not bend. After that, the power test runs.

4. The installation of the trolley slide wire is inconvenient. If you encounter running and debugging operation, the collector sparks, you need to check the guide rail connector, and properly brush the brush, and ensure 60% contact area.

2. A method for installing a trolley slide wire in a factory building and a step for installing a trolley wire bracket, the method comprising the following steps:

1. According to the installation height of the trolley wire, make a “Z” shaped trolley wire bracket mounting mold;

2. Mount the trolley wire mounting bracket on the driving track on the driving track platform;

3. Use the adjusting screw of the mounting mold to adjust the mold, and observe the straightness of the mounting mold through the level meter to make it level and fix it;

4. The construction personnel in the cage placed the trolley wire bracket on the lower horizontal end of the mounting mold and welded firmly; the alignment of the trolley wire was performed on the track platform using the trolley wire alignment detector. After installing the trolley wire, determine whether the trolley wire meets the standard.

This article on the installation program of the trolley line, if your company wants to transform the workshop or the demand line, you can consult me ​​at any time, I will provide you with a detailed workshop renovation program.

Square Gabion Box

Square Gabion Box,Galvanized Welded Gabion Box,Welded Wire Mesh Box,Galvanized Gabion Box

Anping Xinghong Metal Wire Mesh Co.,Ltd , https://www.xinghongmetal.com

Posted on