Zhangjiakou Gold Mine Carbon Pulp Mill (1)

Zhangjiakou gold mine was put into operation in 1970, the designed capacity of 500t / d, the original process is amalgamation + flotation, recovery rates of 75% in 1984, the transformation of gold extraction process for the CIP, dressing and smelting recovery rate More than 93%, and after several technical transformations, the production scale reached 600t/d.
Ore nature: It is a medium-temperature hydrothermal fissure filled quartz vein type deposit. The ore is a type of sulfide-containing gold-bearing quartz vein. The main metal ore minerals limonite ore and hematite, galena and followed by white lead, lead alumina, magnetite, and a small amount of pyrite, copper ore and natural gold. Gangue minerals quartz, followed with a silk mica, feldspar, calcite, dolomite, and the like.
Most of the natural gold and metal minerals are symbiotic, among which the limonite contains gold. The ore density is 2.51 t/m 3 .
Process: After the original ore is broken by two closed-circuit processes, the particle size of the ore is -12mm. After two stages of grinding, the fineness of the ore reaches 85%-200 mesh (-0.074mm). The finely ground ore is dehydrated by a high-efficiency thickener, and the concentration of the slurry is increased to 40% to 45%, and then fed to the carbon immersion system. Cyanide is added to the carbon immersion system, filled with medium pressure air, and activated carbon is added. After two pre-dip and seven-stage soaking, the tail slag grade dropped to 0.3g/t and the tail grade dropped to 0.03g/t. The carbon leaching tailings are discharged to the sewage treatment system and treated by the alkali chloride method. After treatment, the cyanide content of the tailings slurry is reduced to less than 0.5 mg/L, and then discharged to the tailings pond for self-purification. The gold-loaded carbon sieve proposed by the carbon leaching system is washed and desorbed and accumulated in the gold recovery system. The charcoal leaching system is completed by a centrifugal carbon pump and a trough bridge. The desorption column and the electric accumulator form a closed circuit, and no noble tank or lean tank is provided. The desorption operation reduces the amount of gold contained in the activated carbon from 3,500 g/t to less than 80 g/t. The desorbed carbon is acid-washed, heated and regenerated, and then returned to the CIL system for use. Desorbing the precious liquid deposits gold in the solution on the cathode through a rectangular electrode. Gold cathode mud extracted once a month, gold and silver to the smelting chamber and smelting separation (see Figure).
Technical data: The process conditions are shown in Table 1, the process indicators are shown in Table 2, and the main material consumption is shown in Table 3.

[next]

Table 1    Zhangjiakou Gold Mine Charcoal Factory Process Conditions [302]

CIL system

Prepreg time

4.1h

Desorption time

18h

Slurry concentration

40%~45%

Desorption temperature

13 5°C

Aeration amount

0.23m 3 / (h· m 3 )

Desorption pressure

0.31MPa

pH

10.5~11.0

Desorption component

1.0% NaOH + 1.0% NaCN

Sodium cyanide concentration

0.04%~0.05%

Desorption flow rate

0.84L/s

Charcoal immersion time

14.35h

Number of cathodes in the electric storage tank

20

Activated carbon density

10~15g/h

Electrogenization time

18h

String charcoal speed

700kg/d

Electrothermal temperature

60~90 °C

Desorption electrowinning system

The amount of charcoal per batch

700 kg

Cell voltage

1.5~3.0V

Preheat time

2h

Slot current intensity

1000A

Pickling operation

Nitric acid concentration

5.00%

Regeneration atmosphere  

water vapor

Fossil concentration

10.00%

Regeneration time

20~40min

Washing time

2.0h

Regeneration speed

25~35kg/h

Heating regeneration

Regeneration temperature

One area 65 0 ° C

Regeneration kiln gives charcoal moisture

40%~50%

Zone 2 810 °C

Recycled carbon cooling method

Water quenching

Three zones 810 °C

Activated carbon regeneration cycle

3 months

Asphalt Mixing Plant

Asphalt mixing plant is one of the key equipment for road construction. It is mainly used in the production of asphalt mixture for paving road surfaces. Asphalt mixing plant consists of a number of parts, including dosing system, dryer, agitator, dust removal system, fuel system and so on.

The batching system is one of the core parts of Asphalt mixing plant. It is responsible for adding various raw materials to the blender in a certain proportion. These raw materials include asphalt, sand, gravel and other additives. The batching system usually consists of a weighing sensor, a batching bucket and a batching transfer device.

The dryer is another important part of the Asphalt mixing plant. It is mainly used for drying raw materials such as sand and stones. There are heating elements and rotating agitators inside the dryer, which can make the raw materials fully heated and mixed evenly.

Mixer is one of the core parts of Asphalt mixing station. It is responsible for mixing various raw materials together to produce a high quality asphalt mixture. The agitator usually consists of multiple mixing blades, which can fully mix the raw materials to ensure the stable quality of the asphalt mixture produced.

Dust removal system is one of the important components of Asphalt mixing plant. It is mainly used to collect dust and exhaust gases generated during the production process. The dust removal system is usually composed of multiple filters, which can effectively filter out dust and exhaust gas to ensure a clean working environment and air quality.

Fuel system is one of the key parts of Asphalt mixing plant. It is responsible for providing the fuel to power the Asphalt mixing plant. The fuel system usually consists of a fuel pump, a fuel filter and a fuel injector.

Asphalt mixing plant is a kind of high efficiency asphalt mixture production equipment, widely used in road construction field. It has the advantages of high automation, high production efficiency, stable product quality and so on, and provides a strong support and guarantee for road construction.

Asphalt Mixing Plant,Mixer Plant,Asphalt Mixing Bitumen Equipment,Asphalt Paving Equipment

BituRock Science & Technology (Jiangsu) CO., LTD , https://www.biturockequipment.com

Posted on