Shandong Qingshang Copper Mine Concentrator

(A) Overview of green copper mine located in Changle County mountain province Changwei region.
The mine was built in the Great Leap Forward in 1958. Due to the interference and destruction of Liu Shaoqi's counter-revolutionary revisionist Lu Hong, it was cut off. Under the guidance of Mao's revolutionary route, the Qingshang Copper Mine was built 200 tons/day in 1971. Selection and selection of enterprises.
The mine is developed for the inclined shaft, and the mining method is shallow hole mining method. Wellhead close to the beneficiation plant, ore from the ore Lifting directly to the warehouse.
The water was taken from the Xihe River, 1.3 km from the concentrator, and the concentrator built a 50 m3 water tower.
The mine power supply comes from Weifang Power Plant, and is introduced into the mine's total step-down substation through a 31-kilometer 35-kilovolt line (transformer capacity is 1800 kVA), and it is also converted to a transformer substation (transformer capacity of 560 kVA). The volts dropped to 380 volts and distributed to the concentrator.
The dressing factory maintenance system is a minor repair every month, a mid-term repair, and a year-end overhaul. Spare Parts are mainly from Zibo Mining Machinery Factory and Commune Machine Repair Factory.
(II) Process 1. Raw ore properties
The mine is a copper-bearing skarn type deposit. The type of ore is a hydrothermal metasomatic type secondary copper sulfide ore. Metallic minerals bornite, followed by the chalcocite, chalcopyrite, pyrite. Gangue minerals potassium feldspar, quartz, hornblende. The ore is simple in nature and has a low oxidation rate. Therefore, in the case of a low grade of ore, a simple sorting process can still obtain better sorting indicators.
2. Process Flow Breaking: Three sections of closed circuit, the original ore size is 350~0 mm, the final crushed product has a particle size of 18~0 mm, and the crushing ratio is 19.
Grinding: a closed-circuit grinding, grinding fineness - 200 mesh accounted for 60%, overflow concentration 30%.
Flotation: use one rough selection, one selection, and the second sweeping process to select copper. The process flow is shown in the figure below.

[next]

Dehydration: Two sections of dewatering are carried out by concentration and filtration, and the concentrate water is 12%.
(III) Main equipment of the concentrator (below)


Bolted Cement Silos

This product is adopt chip-mounted cement silo is specially designed and developed for the difficulty of packing and the high transportation cost. The top of the warehouse is equipped with a pressure relief valve to balance the pressure inside the chamber. Prevent explosions. Each cement silo is provided with an upper and lower material level indicator, which can display the empty state of the silo.

Silo Storage,Bolted Cement Silo,500Tons Bolted Cement Storage Silo,200Tons Bolted Bulk Cment Silo

Shandong Zeyu Heavy Industry Science and Technology Co.,Ltd. , https://www.sdcementsilo.com

Posted on