Asphalt Roller Machine Production Line (Automatic / Semi-automatic)

Model NO.: BF-GXLQ-1300
Power: 220V
Power Source: Electric/Ga/ Diesel
Thickness: 2-4mm
Warranty: 12 Months
Speed: 5-60m/Min(Adjustable)
Capacity: 3-15 Million Sqm Per Year
After-Sales Service Provided: Engineers Available to Service Machinery Overseas
Main Workshop: 68m*12m*8m
Standard Width: 1000mm
Length: 7.5-10m/Roll
Trademark: Benefit
Transport Package: Seaworthy Package
Specification: 68*12*6m
Origin: China(Mainland)
HS Code: 8474802000
Model NO.: BF-GXLQ-1300
Power: 220V
Power Source: Electric/Ga/ Diesel
Thickness: 2-4mm
Warranty: 12 Months
Speed: 5-60m/Min(Adjustable)
Capacity: 3-15 Million Sqm Per Year
After-Sales Service Provided: Engineers Available to Service Machinery Overseas
Main Workshop: 68m*12m*8m
Standard Width: 1000mm
Length: 7.5-10m/Roll
Trademark: Benefit
Transport Package: Seaworthy Package
Specification: 68*12*6m
Origin: China(Mainland)
HS Code: 8474802000
 
Production line parts
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)

Technical parameter
Item SBS/APP modified asphalt membrane production line 
Feature 1.Flexible layout based on customer's factory
2.Engineers overseas installation after sales
3.Easy operation
4.Versatile production capacity for various specifications 
5.Effective smoke treating system to protect environment
Standard structure of 
one set
1.Indoor roll forming line 
2.Heating Boiler System
3.Raw materials mixer and oxidation system
4.Smoke treating system(Outdoor parts)

Finished products (bitumen membrane)type(surfacing)
  • Two sides with PE film(Embossing or smooth)
  • One side with PE film,one side with sand(Coarse aggregate)
  • One side with PE film,one side with aluminum film(Embossing or smooth)
  • Self-adhesive bitumen waterproof membrane
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)

Characteristic


a) SBS modified bitumen water proofing membrane is specially used as waterproof material in cold area
b) APP is specially suitable for areas of high temperature and of strong sun-shine SBS/APP Modified Bitumen Water proofing Membrane
c)Good performance in Good impermeability ,anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew,anti-weathering
d)Possess good tensile strength, elongation rate and size stability which could be well suited the substrate distortion and crack

Application method

1.Make sure the roof deck smooth,clean and dry(Moisture<9%),then apply the surface of roof deck homogeneously with a kind bitumen paint till dry to start application.
2.There are two methods in application:
One way is by heating and melting method---Heat the polyethylene film of the membrane and roof decksurface by heating and melting method to be nearly melted (not flowing),then install the membrane fully bonded to the roof deck with overlaps of 5-10cm.The other way is by cold adhesive method---Pour the cold adhesive homogeneously on the roof deck,then roll the membrane to install it to be fully sticked to roof deck.By heating and melting method and by cold adhesive can be used in alternation in application as requested.
3.After application ,a full serious inspection is required to sure no air bubble,no fold,no falling away etc.to guarantee the waterproof life.
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)

FAQ

SBS APP modified bitumen membrane production line, bitumen waterproof membrane machine  to produce bitumen membrane rolls 
1)Engineers will supply overseas installation guiding service.
 
2)Installation will be finished within 3 months normally.
(buyer should supply enough labour help and installation tools help )
 
3)Trial operation will be finished within 15days normally.
(buyer should supply necessary raw materials and auxiliary tools and rooms )
 
4)We welcome your visit to our factory ,then,it would be our greatest pleasure to introduce every part to you face-to-face. you can choose the parts you need or delete the parts you don't need.modified bitumen membrane production line, bitumen waterproof membrane machine.
 
Production line parts
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)

Technical parameter
Item SBS/APP modified asphalt membrane production line 
Feature 1.Flexible layout based on customer's factory
2.Engineers overseas installation after sales
3.Easy operation
4.Versatile production capacity for various specifications 
5.Effective smoke treating system to protect environment
Standard structure of 
one set
1.Indoor roll forming line 
2.Heating Boiler System
3.Raw materials mixer and oxidation system
4.Smoke treating system(Outdoor parts)

Finished products (bitumen membrane)type(surfacing)
  • Two sides with PE film(Embossing or smooth)
  • One side with PE film,one side with sand(Coarse aggregate)
  • One side with PE film,one side with aluminum film(Embossing or smooth)
  • Self-adhesive bitumen waterproof membrane
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)

Characteristic


a) SBS modified bitumen water proofing membrane is specially used as waterproof material in cold area
b) APP is specially suitable for areas of high temperature and of strong sun-shine SBS/APP Modified Bitumen Water proofing Membrane
c)Good performance in Good impermeability ,anti-puncture, anti-broker, anti-resistance, anti-erosion, anti-mildew,anti-weathering
d)Possess good tensile strength, elongation rate and size stability which could be well suited the substrate distortion and crack

Application method

1.Make sure the roof deck smooth,clean and dry(Moisture<9%),then apply the surface of roof deck homogeneously with a kind bitumen paint till dry to start application.
2.There are two methods in application:
One way is by heating and melting method---Heat the polyethylene film of the membrane and roof decksurface by heating and melting method to be nearly melted (not flowing),then install the membrane fully bonded to the roof deck with overlaps of 5-10cm.The other way is by cold adhesive method---Pour the cold adhesive homogeneously on the roof deck,then roll the membrane to install it to be fully sticked to roof deck.By heating and melting method and by cold adhesive can be used in alternation in application as requested.
3.After application ,a full serious inspection is required to sure no air bubble,no fold,no falling away etc.to guarantee the waterproof life.
Asphalt Roller Machine Production Line (Automatic / Semi-automatic)

FAQ

SBS APP modified bitumen membrane production line, bitumen waterproof membrane machine  to produce bitumen membrane rolls 
1)Engineers will supply overseas installation guiding service.
 
2)Installation will be finished within 3 months normally.
(buyer should supply enough labour help and installation tools help )
 
3)Trial operation will be finished within 15days normally.
(buyer should supply necessary raw materials and auxiliary tools and rooms )
 
4)We welcome your visit to our factory ,then,it would be our greatest pleasure to introduce every part to you face-to-face. you can choose the parts you need or delete the parts you don't need.modified bitumen membrane production line, bitumen waterproof membrane machine.

3Ton Electric Forklift

We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.We have R&D office in Japan. There are four manufacturing bases and two import and export companies,they are in Shandong province,Hunan Province,and Guangdong province.

Forklift Electric 3 Ton,Efficient Electric Forklift 3 Ton,Mini Electric Forklift Truck,3 Ton Small Forklift

Shandong Davoo Machinery Co., Ltd. Trading Company , https://www.shandingforklift.com

Posted on